Project Name : Design Build and Operate (DBO) of 45 MLD capacity tertiary treatment reverse Osmosis TTRO) Plant at Kodungaiyur including supply and laying DI Transmission mains for conveyance of product water to various Industries in Manali Area, Chennai . TamilNadu
Client : CMWSSB – A/c BGR Energy
Value : 30.70 CRORE
Scope of Work : Detailed Engineering
Construction of following items :
Civil Works
-
Pre Engineering survey
-
Pipe Carrying Bridge with Span of 40 m -3 lot
-
Pile Foundation - 3 Lot
-
Structural works – 3 Lot
-
Construction of Coffer dam – 1 Lot
-
Mobilization of Dredger, Dredging and Supply and Laying of 900 mm dia HDPE Pipe at 4 meter depth under bed level - 850 Meter
Construction of Treatment units
-
Pre Chlorination tank – 1 No
-
Rapid Gravity sand filter – 1 No
-
UF Feed Sump & Back wash Tank – 1 No
-
UF & RO Shed – 1 No
Gallery :
All Projects
-
50 MLD SEWAGE TREATEMENT PLANT AT CHENNAI
-
WATER SUPPLY SCHEME TO MMJU IN CHENNAI CITY
-
WATER DISTRIBUTION SYSTEM TO MADHAVARAM, CHENNAI
-
11 MLD & 3.15 MLD WATER TREATMENT PLANT @ GOBICHETTIPALAYAM
-
WATER SUPPLY IMPROVEMENT SCHEME TO PALLAVARAM, CHENNAI
-
Projects Executed for Private Client
-
INDUSTRIAL / FACTORY BUILDING





WhatsApp us